[Do you really know how to install the cooling tower correctly?]
Release date:[2020/12/14] Is reading[527]次

Do you really know how to install the cooling tower correctly?


Choose the cooling tower according to your own needs. The next step is to install the cooling tower. When installing the cooling tower, you need to pay attention to the following items. By the way, the installation of the cooling tower is very important. Yo!


The cooling tower is a device that uses the contact between air and water (direct or indirect) to cool water. It uses water as the circulating cooling medium to absorb heat from a system and discharge it to the atmosphere, thereby reducing the temperature in the tower and making cooling water. Recycling equipment.


Key points and precautions for cooling tower installation:


1. The model, specifications and technical parameters of the cooling tower must meet the design requirements. And review whether the site layout conditions can meet the specifications and technical requirements of the manufacturer, including the layout spacing, orientation, barriers, structural load-bearing, vibration, noise and other impacts on the equipment performance and surroundings. If there are insufficient, measures should be taken in advance to deal with them in place , And even adjust the program.


2. The elevation of the foundation should meet the design requirements, with an allowable error of ±20mm. In particular, it should be checked whether the foundation height meets the requirements of drainage and maintenance space; the connection between the cooling tower and the embedded parts should be leveled, and the fixing should be firm. The connecting parts should adopt hot-dip galvanized or stainless steel bolts, and their tightening force should be consistent and uniform.


3. The cooling tower should be installed horizontally. When multiple cooling towers of the same cooling water system are installed, the height of the water surface of each cooling tower should be the same, and the height difference should not be greater than 30mm.


4. The direction and position of the water outlet and nozzle of the cooling tower should be correct. The water pool should be tight and free of leakage. The return pipe at the bottom of the water pool should be equipped with a filter; the water distributor should be evenly distributed and the nozzle chassis should be kept in the same On a horizontal surface, a cover should be made to protect it from sunlight to prevent algae growth. The rotating part of the cooling tower with rotating water distributor should be flexible, and the direction of the spray outlet should be consistent according to the design or product requirements.


5. The radial clearance between the end of the cooling tower fan blade and the tower body should be uniform. For blades with adjustable angle, the angle should be the same.


6. The cooling tower should be equipped with reliable lightning protection devices, and the electrical equipment should be reliably grounded.


Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. has been focusing on the design, development and production of industrial air conditioning equipment for many years. Its industrial refrigeration is widely used. Its main products are: industrial air conditioning, chemical fiber industrial air conditioning, textile industrial air conditioning, chemical fiber industrial refrigeration, and dust-free workshop refrigeration , Ventilation ducts, cooling towers, refrigerators and other air conditioning units and accessories.


Jiangsu Jincheng is a rare conscience manufacturer in the industrial refrigeration industry. If you want to know more product information, please contact: Mr. Song 13705113637 Website: http://m.pc20080808.cn/


Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術(shù)支持:中國丙綸網(wǎng)